久久久久久久精品成人热小说,亚洲 欧美 激情 小说 另类,亚洲精品国产精华液,激烈 痉挛 抽搐 潮喷 MP4

News

Common problems and solutions for dispensing valves

Release Date:2017-06-22
Common problems and solutions for dispensing valves

1. Leakage of rubber valve
This situation often occurs after the pre glue valve is closed, and 95% of it is due to the small diameter of the needle used. A needle that is too small can affect the flow of liquid and cause back pressure, resulting in dripping shortly after the rubber valve is closed. A too small needle can also affect the exhaust bubble action when the rubber valve is first used.
Solution: The pressure of the pressure bucket can be adjusted, not too high, and it can drive the glue. If the dispensing valve can be fine tuned, try to adjust it as small as possible (to reduce the quick response time of the dispensing valve), or replace the larger needle to solve this problem. The conical inclined needle produces the least back pressure and the smoothest liquid flow. The air inside the liquid will drip after the rubber valve is closed. It is best to eliminate the air inside the liquid in advance or use a rubber that is less likely to contain bubbles. Or centrifuge the glue to remove bubbles before use.
2. Inconsistent adhesive size
When the dispensing is inconsistent, it is mainly due to the unstable pressure of the pressure cylinder or air storing the fluid.
Solution: The intake pressure regulator should be set at 10 to 15 psi lower than the minimum pressure in the factory. The pressure used for the pressure cylinder should be above the pressure in the middle of the pressure gauge, and the use of pressure in the low pressure part of the pressure gauge should be avoided. The control pressure of the glue valve should be at least 60psi to ensure stable glue dispensing. Finally, the glue dispensing time should be checked. If it is less than 15/1000 seconds, it will cause unstable glue dispensing. The longer the glue dispensing time, the more stable the glue dispensing.
3. The flow rate is too slow
If the flow rate is too slow, the pipeline should be changed from 1/4 "to 3/8". If there is no need, the pipeline should be as short as possible.
4. Bubbles in the fluid
Excessive fluid pressure combined with too short valve opening time may allow air to seep into the liquid.
Solution: Reduce fluid pressure and use a conical angled needle.
5. Instant glue (quick drying glue) blocks the glue valve/joint/and pipeline
This situation is mainly due to excessive moisture or repeated use of instant glue.
Solution: Ensure the use of fresh instant glue. Thoroughly clean the pipeline with acetone free of moisture, ensure that the air used is dry, and install a filter between the air pressure and rubber valve system in the factory. If the above methods are still ineffective, nitrogen should be used
展開
亚洲熟妇丰满多毛XXXX| 播放男人添女人下边视频| 国产FREEXXXX性播放麻豆| 国产后入清纯学生妹| 久久人妻无码一区二区| 又大又粗又长又猛a片蜜桃| 灌牛奶cao哭男男腐纯肉打屁股| 国产成人精品一区二三区在线观看 | 人妻丰满精品一区二区a片| 亚洲最大AV资源站无码AV网址| 色五月丁香六月欧美综合| 丰满少妇a级毛片| 日韩精品人妻系列无码专区| 人妻夜夜爽天天爽三区麻豆av| 免费AV网站| 寂寞少妇扒开双腿猛烈进入免费看| 乱肉黄蓉合集500篇| 国产96在线 | 亚洲| 娇小videodes极品| jizz性欧美2| 无码人妻丰满熟妇区五十路| 老妇bbw搡bbbb搡bbbb| 国产婷婷成人久久AV免费高清| 大战丰满人妻性色av偷偷红豆| china贵州少妇video| 精品无码一区二区三区亚洲桃色| 人妻凌参观1看动漫在线| 久久久久久A亚洲欧洲AV| 黑人97人人模人人爽人人喊| 女口述第一次放进去的感受| 女人爽到高潮30分钟一次正常吗| 惩罚她给她用最粗的玉势h| 国产一区二区三区不卡AV| 超级yin荡的高中女学生h | 日本gay视频japan| 一次灌浆与二次灌浆| 精品一区二区三区在线观看| 一本一道精品欧美中文字幕| 精品无码国产自产拍在线观看| 亚洲AV午夜福利精品一区| 精品少妇高潮蜜臀涩涩av|