久久久久久久精品成人热小说,亚洲 欧美 激情 小说 另类,亚洲精品国产精华液,激烈 痉挛 抽搐 潮喷 MP4

News

Common problems and solutions for dispensing valves

Release Date:2017-06-22
Common problems and solutions for dispensing valves

1. Leakage of rubber valve
This situation often occurs after the pre glue valve is closed, and 95% of it is due to the small diameter of the needle used. A needle that is too small can affect the flow of liquid and cause back pressure, resulting in dripping shortly after the rubber valve is closed. A too small needle can also affect the exhaust bubble action when the rubber valve is first used.
Solution: The pressure of the pressure bucket can be adjusted, not too high, and it can drive the glue. If the dispensing valve can be fine tuned, try to adjust it as small as possible (to reduce the quick response time of the dispensing valve), or replace the larger needle to solve this problem. The conical inclined needle produces the least back pressure and the smoothest liquid flow. The air inside the liquid will drip after the rubber valve is closed. It is best to eliminate the air inside the liquid in advance or use a rubber that is less likely to contain bubbles. Or centrifuge the glue to remove bubbles before use.
2. Inconsistent adhesive size
When the dispensing is inconsistent, it is mainly due to the unstable pressure of the pressure cylinder or air storing the fluid.
Solution: The intake pressure regulator should be set at 10 to 15 psi lower than the minimum pressure in the factory. The pressure used for the pressure cylinder should be above the pressure in the middle of the pressure gauge, and the use of pressure in the low pressure part of the pressure gauge should be avoided. The control pressure of the glue valve should be at least 60psi to ensure stable glue dispensing. Finally, the glue dispensing time should be checked. If it is less than 15/1000 seconds, it will cause unstable glue dispensing. The longer the glue dispensing time, the more stable the glue dispensing.
3. The flow rate is too slow
If the flow rate is too slow, the pipeline should be changed from 1/4 "to 3/8". If there is no need, the pipeline should be as short as possible.
4. Bubbles in the fluid
Excessive fluid pressure combined with too short valve opening time may allow air to seep into the liquid.
Solution: Reduce fluid pressure and use a conical angled needle.
5. Instant glue (quick drying glue) blocks the glue valve/joint/and pipeline
This situation is mainly due to excessive moisture or repeated use of instant glue.
Solution: Ensure the use of fresh instant glue. Thoroughly clean the pipeline with acetone free of moisture, ensure that the air used is dry, and install a filter between the air pressure and rubber valve system in the factory. If the above methods are still ineffective, nitrogen should be used
展開
艳妇臀荡乳欲伦交换h| 国产精品99久久久久久擦边| 亚洲熟妇色自偷自拍另类| 装睡被陌生人摸出水好爽| 老司机午夜福利视频| 午夜成人无码福利免费视频| 久久久久久久做爰片无码| 午夜成人无码福利免费视频| 亚洲成AV人片在线观看无码| 无套和妇女做内谢| 成人H视频在线观看| 日本欧美久久久久免费播放网| 欧美乱大交XXXXX潮喷| 精品国产一区二区三区AV 性色| 久久无码人妻精品一区二区三区 | 朋友人妻翘臀迎接粗大撞击| AV鲁丝一区鲁丝二区鲁丝三区| 青草视频在线播放| 亚洲AV无码乱码在线观看富二代 | 男男啪啪激烈高潮cc漫画免费| 三上悠亚在线观看| 美国a片| 美女与野兽免费观看| 久久久中日AB精品综合| 亚洲色大成网站WWW久久九九 | 日韩AV无码成人精品国产| 扒开腿狂躁女人视频免费| 激情综合亚洲色婷婷五月APP| 猫咪亚洲精品无码mv在线观看 | 丰满中国少妇和黑人玩| 九色少妇丨porny丨自拍| 国产精品毛片无码| 久久久精品人妻一区二区三区四| 成A人片亚洲日本久久| 张栢芝全套94张未删图| 18款禁用免费安装的软件app| 又黄又爽的无遮挡免费视频人妖| 国产97在线 | 亚洲| 国产99久久精品一区二区 | 国产午夜精品一区二区| 果冻传媒剧国产MV在线观看 |